Press "Enter" to skip to content

Barking Power Station chimneys blown down

Decommissioning consultant RVA has overseen the demolition of two 55-metre high chimneys at Barking Reach Power Station in East London.

Decommissioning consultant RVA has overseen the demolition of two 55-metre high chimneys at Barking Reach Power Station in East London.

Read Full Article: The Construction Index

Be First to Comment

Leave a Reply

Your email address will not be published. Required fields are marked *

(C)2012-2018 UK Construction.com Ltd