Press "Enter" to skip to content

Study shows cut price designs result in inefficient buildings

UK buildings are routinely being over-designed with 50% more electrical capacity and 30% more heating and cooling capacity than they will ever need, a study has found.

UK buildings are routinely being over-designed with 50% more electrical capacity and 30% more heating and cooling capacity than they will ever need, a study has found.

Read Full Article: The Construction Index

Be First to Comment

Leave a Reply

Your email address will not be published. Required fields are marked *

(C)2012-2018 UK Construction.com Ltd